The CPC-220 Airport Water Paper Cone Machine with Curling Edge Forming features an easy-to-use interface and requires minimal human intervention throughout the production process. Its production speed reaches 190–230 pieces per minute. Equipped with a user-friendly operating system, the machine allows operators to easily set parameters for different cone sizes simply by pressing a button.





Switzerland Robatech boriginal nozzle at the bottom of the bonding more solid.

Robatech, a leading industrial adhesive application specialist, manufactures this precision dispensing valve. Designed for automated production lines, it accurately applies hot melt or cold adhesives with high speed and control.

This core part of the paper cone making machine guides glued paper strips, precisely winds them into tapered shapes, and ensures firm bonding, determining the cone’s precision, strength, and quality.

This vacuum system for paper cone making machines provides suction to hold paper during winding, ensures precise forming, aids glue application, and delivers air for material feeding, drying, and demolding.

Special materials made of cone mold has a very long service life.
|
Description |
Mid-Speed Automatic Paper Cone Making Machine is made for ice cream and other similar paper cone sleeve. |
|
Item |
CPC-220 |
|
Speed |
190-230pcs/min |
|
Paper Cup Size |
4-10oz |
|
Cone angle |
customized |
|
Cone length |
customized |
|
Raw material |
80-170 g/m2, art paper/aluminized paper/ offset paper/ wax paper etc. |
|
Electricity |
220V50Hz1phase、 380V50Hz3phase or customize |
|
Power |
9kw |
|
Net weight |
1000Kgs |
|
Dimension |
1850*1750*1800mm |
|
Main parts brand |
PLC: Mitubishi Glue box: Robatech VACUUM PUMP: Huitong TRANSDUCER: Delta SENSOR: Panasonic ELECTRICAL PARTS: Schneider +Panasonic |
1. The guide booklet will be sent with machine to guide the installation process works, adjust the whole machine, production, avoid or solve the problem which the buyer will face.
2. Test run of the machine & training:
(a)We will adjust the machine well for one week before the delivery, ensure the machine has the perfect performance.
(b)We can dispatch technologists to buyer’s factory, guiding installation, adjustment for a period, the buyer in charge of the salary, traffic fee, boarding and lodging, communication living allowances.
3. Training of buyer in China:
We supply the free training of buyer, the training won’t stop until the buyer control the whole lesson! The cost of air ticket, boarding and lodging should provided by buyer
4. We supply the consumable spare parts for free for one years use
We warranty against any defects in design and workmanship for 1 year from the shipment date
This warranty won’t be applied to parts which are subject to wear and require normal replan cement and to the durability of condition
We are not responsible for the damage caused by misuse, improper handling, neglectful maintenance, force injury and other reasons beyond our responsibility.



Product Recommendation
Latest News
GET A QUOTE